Grenfell Tower Inquiry Recommendations
In line with the Grenfell public enquiry Phase 1 report, RBFRS recommends considering implementing the following measures:
- A premises information box for the building that contains up to date information, including accurate floor plans, evacuation plan for the building and access keys.
- Prepare personal emergency evacuation plans (PEEPs) for all residents whose ability to self-evacuate may be compromised (such as persons with reduced mobility or cognition).
- Include up-to-date information about persons with reduced mobility and/or cognition and their associated PEEPs in the premises information box.
- Building floor numbers be clearly marked on each landing within the stairways and in a prominent place in all lobbies in such a way as to be visible both in normal conditions and in low lighting or smoky conditions.